Western Roads Upgrade (Maintenance Phase)

Western Roads Upgrade (Maintenance Phase)

Underground Service Locating and Mapping

Project: Western Roads Upgrade Maintenance Phase

Principal Contractor: Ventia (Netflow)

The Western Roads Upgrade Maintenance Phase continues the broader Western Roads Upgrade program, keeping newly upgraded roads across Melbourne's west in good condition. The maintenance phase covers ongoing pavement, drainage and asset maintenance across the roads delivered under the earlier construction phase. Works are carried out progressively across multiple sites while keeping roads open to traffic wherever possible. The program supports the long-term reliability of key freight and commuter routes across Melbourne's western suburbs.

Key aspects of the project include:

  • Ongoing maintenance across roads delivered under the Western Roads Upgrade program
  • Pavement, drainage and asset maintenance works
  • Staged works carried out across multiple sites in Melbourne's west
  • Program supports long-term reliability of key freight and commuter routes

HCS is engaged on the project to provide Underground Service Locating services.

Western Outer Ring Main

Western Outer Ring Main

Underground Service Locating and Mapping

Project: Western Outer Ring Main

Principal Contractor: Spiecapag Australia

The Western Outer Ring Main is a major gas transmission pipeline project delivered by APA Group to strengthen gas supply capacity across Melbourne’s western and northern growth corridors.

The project involves the installation of approximately 51 kilometres of large-diameter gas pipeline connecting Plumpton to Wollert.

Works are being staged across multiple sections to minimise disruption to traffic, residents and existing infrastructure.

Extensive coordination is required with other utility owners given the scale and route length of the pipeline corridor.

Key aspects of the project include:

  • Installation of a large-diameter gas transmission pipeline
  • Approximately 51 kilometres of pipeline connecting Melbourne’s western and northern growth corridors
  • Staged construction across multiple sections to reduce disruption
  • Significant coordination required with other utility owners along the corridor

HCS is engaged on the project to provide Underground Service Locating services.

Western Roads Upgrade (Construction Phase)

Western Roads Upgrade (Construction Phase)

Underground Service Locating and Mapping

Project: Western Roads Upgrade Construction Phase

Principal Contractor: WBHO Infrastructure (Netflow)

The Western Roads Upgrade Construction Phase delivers major road widening and intersection upgrades across Melbourne's growing western suburbs. The program improves a network of roads to support population growth, easing congestion and improving safety for local communities. Works include additional traffic lanes, new and upgraded intersections, and new pedestrian and cyclist infrastructure. Construction is being staged across numerous sites to manage impacts on traffic and residents across the western growth corridor.

Key aspects of the project include:

  • Road widening and intersection upgrades across Melbourne's west
  • Additional traffic lanes to support population growth
  • New and upgraded pedestrian and cyclist infrastructure
  • Staged construction across numerous sites in the western growth corridor

HCS is engaged on the project to provide Underground Service Locating services.

MELBOURNE AIRPORT INTERNATIONAL TERMINAL

MELBOURNE AIRPORT INTERNATIONAL TERMINAL

Underground Service Locating and Mapping

Project: Melbourne Airport International Terminal

Principal Contractor: To be confirmed – main works contractor not yet publicly announced

The Melbourne Airport International Terminal project delivers a major expansion of terminal facilities to accommodate future growth in passenger numbers. The works include new gate lounges, retail and dining precincts, and expanded baggage handling infrastructure. Construction is being carried out within a live, operational airport environment, requiring careful staging and coordination. The project involves extensive below-ground services works to support the expanded terminal footprint.

Key aspects of the project include:

  • Major expansion of international terminal facilities
  • New gate lounges, retail and dining precincts
  • Expanded baggage handling infrastructure
  • Construction staged within a live, operational airport environment

HCS is engaged on the project to provide Underground Service Locating services.

FITZSIMONS LANE UPGRADE

FITZSIMONS LANE UPGRADE

Underground Service Locating and Mapping

Project: Fitzsimons Lane Upgrade

Principal Contractor: BMD Constructions

The Fitzsimons Lane Upgrade widens Fitzsimons Lane between Porter Street and Reynolds Road to reduce congestion in Melbourne's north-east. The project delivers a new bridge over the Yarra River, additional traffic lanes, and a new signalised intersection at Porter Street. New shared user paths and landscaping are also being delivered to improve safety and amenity for the local community. The upgrade is being constructed alongside the Yarra River, requiring careful management of environmentally sensitive areas and existing services.

Key aspects of the project include:

  • New bridge over the Yarra River with additional traffic lanes
  • New signalised intersection at Porter Street
  • New shared user paths and landscaping improvements
  • Construction managed alongside environmentally sensitive river areas

HCS is engaged on the project to provide Underground Service Locating services.