Ground Penetration Permit
Guides · Excavation safety
Ground Penetration Permit (GPP)
Work through each section on screen, from the desktop BYDA review (Quality Level D) to excavation and permit authorisation. Your entries stay in this browser only and are not sent anywhere. When complete, use Print / Save as PDF for an A4 copy to sign off and attach to the job file.
Before you use this guide
- Guide only. This form is provided by Heavy Construction Solutions Pty Ltd (HCS) as a general guide only. It is not legal, engineering or safety advice, and it does not replace your own site-specific risk assessment, SWMS, permits, or the requirements of asset owners, regulators and AS 5488.
- No responsibility for errors or omissions. HCS makes no warranty that this form is complete, accurate or current, and may change it at any time without notice. To the maximum extent permitted by law, HCS is not responsible for any error or omission in this form.
- Limitation of liability. To the maximum extent permitted by law, HCS is not liable for any loss, damage, injury, cost or claim, including indirect or consequential loss, arising from the use of or reliance on this form or any permit prepared with it.
- Your responsibility. You are responsible for checking that this form suits your project, for all information entered into it, and for confirming the current requirements of AS 5488.1:2022, Before You Dig Australia, asset owners and the work health and safety laws that apply to your work.
- Indemnity. By using this form you agree to indemnify HCS against any claim, loss or cost arising from your use of it.
- Your information. Entries are kept in your browser only and are not sent to HCS.
- Your rights. Nothing in this notice excludes any right that cannot be excluded under the Australian Consumer Law.
Tick the box above to unlock the permit.