Call 1300 859 027 SOLUTIONS@HEAVYCS.COM.AU
Western Outer Ring Main

Western Outer Ring Main

Western Outer Ring Main

The Western Outer Ring Main project is a high pressure, buried gas transmission pipeline, approximately 51 kilometres long, which will provide a new connection between existing pipelines at Plumpton in Melbourne’s west and Wollert in the north. The project also includes an upgrade to the existing compressor station at Wollert. HCS Was engaged to provide Underground Service Locating Services to this Vital Gas Infrastructure Upgrade Project.

Western Roads Upgrade (Construction Phase)

Western Roads Upgrade (Construction Phase)

Western Roads Upgrade (Construction Phase)

HCS was engaged by WBHO to carry out the initial services investigation for design purposes, as well as providing Digital Engineering and Engineering Services to the project.

The Western Roads Upgrade will improve 8 main roads across the West. It will also repair and resurface 37 roads and strengthen seven structures, mostly bridges.

The project:

  • is a $1.8 billion investment to improve roads in the western suburbs
  • includes a 20-year maintenance contract, which guarantees the ongoing care of 260kms of road from Footscray to Werribee.
  • is being delivered through a Public Private Partnership (PPP) between the Victorian Government and project consortium, Netflow
    MELBOURNE AIRPORT INTERNATIONAL TERMINAL

    MELBOURNE AIRPORT INTERNATIONAL TERMINAL

    MELBOURNE AIRPORT INTERNATIONAL TERMINAL

    HCS was engaged by John Holland to carry out concrete scanning services for the upgrading of the international terminal entry.

    The work comprised investigation and recording of the position of steel reinforcement and electrical services contained within the existing concrete floor. As a result of our work, the installation of gates that were required to be drilled into the floor was carried out safely and without incident.

    FITZSIMONS LANE UPGRADE

    FITZSIMONS LANE UPGRADE

    FITZSIMONS LANE UPGRADE

    HCS has been engaged on the Fitzsimons Lan Upgrade project to provide service locating services to BMD.

    The Fitzsimons Lane Upgrade includes:

    • new traffic lights at the Main Road and Leane Drive intersection
    • traffic lights to replace roundabouts at the Fitzsimons Lane and Main Road intersection and Fitzsimons Lane and Porter Street intersection
    • an upgraded signalised intersection at Williamsons Road and Foote Street
    • opening bus lanes to all vehicle use between Porter and Foote Streets
    • relocation of the iconic River Peel structure
    • new walking and cycling paths
    • safety barriers at key locations.
    Canberra Light Rail

    Canberra Light Rail

    Canberra Light Rail

    HCS was engaged by the Canberra Metro Consortium to provide Engineering Surveying Services on the Canberra Light Rail Project.

    The light rail project will run from City to Gungahlin, along Northbourne Avenue and Flemington Road and will deliver high quality, reliable and frequent public transport down one of Canberra’s busiest corridors.

    The project will provide the following:

    • 12 km route
    • 6 minute peak service
    • 10-15 minute off peak
    • 13 stops
    • 14 light rail vehicles
    • 24 minute journey time
    • Same level boarding at all stops
    • 2 dedicated wheelchair spaces
    • Capacity of more than 200 people
    Call us now