Southern Apron Expansion

Southern Apron Expansion

Airports

Project: Southern Apron Expansion

Principal Contractor: Fulton Hogan

The Southern Apron Expansion delivered 13 hectares of new airfield pavement and services at Melbourne Airport, undertaken by Fulton Hogan for client Australia Pacific Airports Melbourne (APAM). The $92 million project was divided into two main areas of work, the Southern Apron Expansion and the Sierra Apron Infill, and included 23 new Code C aircraft parking bays along with the relocation of freight aircraft operations. Works comprised 27,000 square metres of asphalt and 110,000 square metres of concrete pavement construction, carried out in a live airside environment. The project was completed with no unplanned impact on aircraft operations, including over the Christmas period, and the Sierra Apron Infill opened for operations more than a year ahead of the contracted end date.

Key aspects of the project include:

  • 13 hectares of new airfield pavement and services
  • 23 new Code C aircraft parking bays and relocated freight aircraft operations
  • 27,000 square metres of asphalt and 110,000 square metres of concrete pavement
  • Delivered in a live airside environment with no unplanned impact on aircraft operations

HCS is engaged on the project to provide Underground Service Locating services.

Taxiway Zulu Program

Taxiway Zulu Program

Airports

Project: Taxiway Zulu Program

Principal Contractor: Fulton Hogan

The Taxiway Zulu Program delivers a major new taxiway network in the northern precinct of Melbourne Airport, undertaken by Fulton Hogan for client Australia Pacific Airports Melbourne (APAM). The $140 million project includes 270,000 square metres of new, extended and realigned taxiway pavement, enabling future expansion of the international terminal and supporting a future third runway. Works include demolishing existing taxiway infrastructure, excavating 250,000 cubic metres of material, and placing 37,000 cubic metres of new concrete taxiway pavement. The project also involves upgrading the Airfield Ground Lighting, constructing a new Airfield Lighting Equipment Room, and mobilising an onsite concrete batching plant.

Key aspects of the project include:

  • 270,000 square metres of new, extended and realigned taxiway pavement
  • Excavation of 250,000 cubic metres of material and placement of 37,000 cubic metres of concrete pavement
  • Upgraded Airfield Ground Lighting and a new Airfield Lighting Equipment Room
  • Supports future expansion of the international terminal and a future third runway

HCS is engaged on the project to provide Underground Service Locating services.

Park Royal T1, T2 & T3 Car Park Upgrade

Park Royal T1, T2 & T3 Car Park Upgrade

Airports

Project: Park Royal T1, T2 & T3 Car Park Upgrade

Principal Contractor: CPB Contractors

The Park Royal T1, T2 & T3 Car Park Upgrade reconfigures the T123 car park at Melbourne Airport, delivered by CPB Contractors for Australia Pacific Airports Melbourne (APAM) as part of the Naarm Way Stage 2 program. The project includes construction of a new 18-metre-wide pedestrian bridge and gateway connecting the T123 car park directly to the terminals. Works also include forecourt reconfiguration and a new vertical transport hub to improve passenger movement between the car park and Terminal 2. The upgraded car park will support new dedicated pick-up and drop-off zones connected directly to the Tullamarine Freeway, due for completion in late 2026.

Key aspects of the project include:

  • Reconfiguration of the T123 car park at Melbourne Airport
  • New 18-metre-wide pedestrian bridge linking the car park to the terminals
  • Forecourt reconfiguration and a new vertical transport hub
  • New pick-up and drop-off zones connected directly to the Tullamarine Freeway

HCS is engaged on the project to provide Underground Service Locating and Concrete Scanning services.

TSB1 and TSB2 Upgrade – Melbourne Airport

TSB1 and TSB2 Upgrade – Melbourne Airport

Airports

Project: TSB1 and TSB2 Upgrade – Melbourne Airport

Principal Contractor: Maz Group

The TSB1 and TSB2 Upgrade delivered new checked baggage screening facilities for Terminal 3 and Terminal 4 at Melbourne Airport, for client Australia Pacific Airports Melbourne (APAM). The design and construct project involved installing multiple CT scanning units and associated conveyor belts, services and infrastructure to meet updated aviation security standards. Works included construction of new elevated mezzanines over the live, operational baggage systems serving Virgin Australia at T3 and Jetstar at T4. The two upgrades were delivered concurrently, involving more than 65 tonnes of structural steel and six CT scanning machines installed across the two terminals.

Key aspects of the project include:

  • New CT scanning units and baggage conveyor infrastructure across T3 and T4
  • New elevated mezzanines built over live, operational baggage systems
  • More than 65 tonnes of structural steel installed across both terminals
  • Six CT scanning machines commissioned across the two upgrades

HCS is engaged on the project to provide Underground Service Locating and Concrete Scanning services.

Naarm Way

Naarm Way

Airports

Project: Naarm Way

Principal Contractor: Seymour Whyte

Naarm Way is a new elevated road system connecting the Tullamarine Freeway directly to Melbourne Airport, delivered for Australia Pacific Airports Melbourne (APAM). Stage 1 opened in July 2023, providing a dedicated $70 million link from the Tullamarine Freeway to the Terminal 4 Transport Hub, bypassing existing roundabouts and traffic lights. Stage 2 extends the elevated road network to provide a direct connection from the Tullamarine Freeway to new pick-up and drop-off zones at the T123 car park. The project also includes a new pedestrian bridge providing direct passenger access from the T123 parking structure to Terminal Two.

Key aspects of the project include:

  • New elevated road connecting the Tullamarine Freeway directly to Melbourne Airport
  • $70 million Stage 1 link to the Terminal 4 Transport Hub, opened July 2023
  • Stage 2 connection to new pick-up and drop-off zones at the T123 car park
  • New pedestrian bridge linking the T123 car park to Terminal Two

HCS is engaged on the project to provide Underground Service Locating services.

Call us now